Enterprise Architecture & Avoiding tunnel vision.

Recently I have read a number of articles and had several conversations with architects and engineers across various specialities in the industry and I’m finding there is a growing trend of SMEs (Subject Matter Experts) having tunnel vision when it comes to architecting solutions for their customers.

What I mean by “Tunnel Vision” is that the architect only looks at what is right in front of him/her (e.g.: The current task/project) , and does not consider the implications of how the decisions being made for this task may impact the wider I.T infrastructure and customer from a commercial / operational perspective.

In my previous role I saw this all to often, and it was frustrating to know the solutions being designed and delivered to the customers were in some cases quite well designed when considered in isolation, but when taking into account the “Big Picture” (or what I would describe as the customers overall requirements) the solutions were adding unnecessary complexity, adding risk and increasing costs, when new solutions should be doing the exact opposite.

Lets start with an example;

Customer “ACME” need an enterprise messaging solution and have chosen Microsoft Exchange 2013 and have a requirement that there be no single points of failure in the environment.

Customer engages an Exchange SME who looks at the requirements for Exchange, he then points to a vendor best practice or reference architecture document and says “We’ll deploy Exchange on physical hardware, with JBOD & no shared storage and use Exchange Database Availability Groups for HA.”

The SME then attempts to justify his recommendation with “because its Microsoft’s Best practice” which most people still seem to blindly accept, but this is a story for another post.

In fairness to the SME, in isolation the decision/recommendation meets the customers messaging requirements, so what’s the problem?

If the customers had no existing I.T and the messaging system was going to be the only I.T infrastructure and they had no plans to run any other workloads, I would say the solution proposed could be a excellent solution, but how many customers only run messaging? In my experience, none.

So lets consider the customer has an existing Virtual environment, running Test/Dev, Production and Business Critical applications and adheres to a “Virtual First” policy.

The customer has already invested in virtualization & some form of shared storage (SAN/NAS/Web Scale) and has operational procedures and expertises in supporting and maintaining this environment.

If we were to add a new “silo” of physical servers, there are many disadvantages to the customer including but not limited too;

1. Additional operational documentation for new Physical environment.

2. New Backup & Disaster Recovery strategy / documentation.

3. Additional complexity managing / supporting a new Silo of infrastructure.

4. Reduced flexibility / scalability with physical servers vs virtual machines.

5. Increased downtime and/or impact in the event hardware failures.

6. Increased CAPEX due to having to size for future requirements due to scaling challenges with physical servers.

So what am I getting at?

The cost of deploying the MS Exchange solution on physical hardware could potentially be cheaper (CAPEX) Day 1 than virtualizing the new workload on the existing infrastructure (which likely needs to be scaled e.g.: Disk Shelves / Nodes) BUT would likely result overall higher TCO (Total Cost of Ownership) due to increased complexity & operational costs due to the creation of a new silo of resources.

Both a physical or virtual solution would likely meet/exceed the customers basic requirement to serve MS Exchange, but may have vastly different results in terms of the big picture.

Another example would be a customer has a legacy SAN which needs to be replaced and is causing issues for a large portion of the customers workloads, but the project being proposed is only to address the new Enterprise messaging requirements. In my opinion a good architect should consider the big picture and try to identify where projects can be combined (or a projects scope increased) to ensure a more cost effective yet better overall result for the customer.

If the architect only looked at Exchange and went Physical Servers w/ JBOD, there is zero chance of improvement for the rest of the infrastructure and the physical equipment for Exchange would likely be oversized and underutilized.

It will in many cases be much more economical to combine two or more projects, to enable the purchase of a new technology or infrastructure components and consolidate the workloads onto shared infrastructure rather than building two or more silo’s which add complexity to the environment, and will likely result in underutilized infrastructure and a solution which is inferior to what could have been achieved by combining the projects.

In conclusion, I hope that after reading this article, the next time you or your customers embark on a new project, that you as the Architect, Project Manager, or Engineer consider the big picture and not just the new requirement and ensure your customer/s get the best technical and business outcomes and avoid where possible the use of silos.

Example Architectural Decision Competition – Submissions

All suitable Example architectural decision submissions will be posted here, please vote for your favourite decision by leaving a comment on this page with the example decision number.

SUBMISSIONS FOR ROUND 1 (Closed!)

1. TSM backup configuration for PureFlex environment?

2. Use of RDMs in Standard IaaS Clusters

3. Scalable network architecture for VXLAN

4. vCloud Allocation Pool Usable Memory

5. New vSphere 5.x environment

6. Improve Performance for BCAs on Cisco UCS

7. (More Coming Soon)

WINNER ROUND ONE: Use of RDMs in Standard IaaS Clusters by Chris Jones @cpjones44

This design decision works around some fairly strict constraints, such as no >2TB LUNs, no IP based storage & the inability for monitoring solution to be customized.

While the decision is ultimately fairly straight forward, the decision documents the issue well and justifies the decision and discusses in depth the implications of the decision.

This is an example of a fairly obvious decision (considering the constraints) but shows even where a decision may be obvious, or the only option, that understanding the implications is important. Documenting even obvious decisions is also important so in the event of movement within the team, the solution can be understood by people not involved in the original design process.

RUNNER UP ROUND ONE: TSM backup configuration for PureFlex environment? By Ash Simpson @Yipikaye1

Not unlike Chris Jones’ decision, Ash’s submission works within the constraints of an existing environment, where hardware and software has already been purchased. This is a common issue, where Hardware / Software is purchased before a detailed design phase. This is a huge problem in the industry and I encourage you all to ensure this trend does not continue. Without a detailed design phase, it is not possible to confirm what hardware/software is required, as such hardware/software should only be purchased after the design to completed.

Again this decision is fairly obvious given the constraints, but the decision explains the benefits of this method of configuration and discusses the implications which is important.

The constraints did not list anything preventing purchasing of a different backup solution, although this is somewhat implied by the assumptions.

Congratulations to Chris Jones @cpjones44 & Ash Simpson @Yipikaye1!

Thank you to everyone who submitted design decisions, and I encourage you all to submit new decisions for Round 2 and am looking forward to new competition participants.

SUBMISSIONS FOR ROUND 2 (Closing 31st October 2013)

1. (More Coming Soon)

2. (More Coming Soon)

3. (More Coming Soon)

 

Example Architectural Decision – ESXi Host Hardware Sizing (Example 1)

Problem Statement

What is the most suitable hardware specifications for this environments ESXi hosts?

Requirements

1. Support Virtual Machines of up to 16 vCPUs and 256GB RAM
2. Achieve up to 400% CPU overcommitment
3. Achieve up to 150% RAM overcommitment
4. Ensure cluster performance is both consistent & maximized
5. Support IP based storage (NFS & iSCSI)
6. The average VM size is 1vCPU / 4GB RAM
7. Cluster must support approx 1000 average size Virtual machines day 1
8. The solution should be scalable beyond 1000 VMs (Future-Proofing)
9. N+2 redundancy

Assumptions

1. vSphere 5.0 or later
2. vSphere Enterprise Plus licensing (to support Network I/O Control)
3. VMs range from Business Critical Application (BCAs) to non critical servers
4. Software licensing for applications being hosted in the environment are based on per vCPU OR per host where DRS “Must” rules can be used to isolate VMs to licensed ESXi hosts

Constraints

1. None

Motivation

1. Create a Scalable solution
2. Ensure high performance
3. Minimize HA overhead
4. Maximize flexibility

Architectural Decision

Use Two Socket Servers w/ >= 8 cores per socket with HT support (16 physical cores / 32 logical cores) , 256GB Ram , 2 x 10GB NICs

Justification

1. Two socket 8 core (or greater) CPUs with Hyper threading will provide flexibility for CPU scheduling of large numbers of diverse (vCPU sized) VMs to minimize CPU Ready (contention)

2. Using Two Socket servers of the proposed specification will support the required 1000 average sized VMs with 18 hosts with 11% reserved for HA to meet the required N+2 redundancy.

3. A cluster size of 18 hosts will deliver excellent cluster (DRS) efficiency / flexibility with minimal overhead for HA (Only 11%) thus ensuring cluster performance is both consistent & maximized.

4. The cluster can be expanded with up to 14 more hosts (to the 32 host cluster limit) in the event the average VM size is greater than anticipated or the customer experiences growth

5. Having 2 x 10GB connections should comfortably support the IP Storage / vMotion / FT and network data with minimal possibility of contention. In the event of contention Network I/O Control will be configured to minimize any impact (see Example VMware vNetworking Design w/ 2 x 10GB NICs)

6. RAM is one of the most common bottlenecks in a virtual environment, with 16 physical cores and 256GB RAM this equates to 16GB of RAM per physical core. For the average sized VM (1vCPU / 4GB RAM) this meets the CPU overcommitment target (up to 400%) with no RAM overcommitment to minimize the chance of RAM becoming the bottleneck

7. In the event of a host failure, the number of Virtual machines impacted will be up to 64 (based on the assumed average size VM) which is minimal when compared to a Four Socket ESXi host which would see 128 VMs impacted by a single host outage

8. If using Four socket ESXi hosts the cluster size would be approx 10 hosts and would require 20% of cluster resources would have to be reserved for HA to meet the N+2 redundancy requirement. This cluster size is less efficient from a DRS perspective and the HA overhead would equate to higher CapEx and as a result lower the ROI

9. The solution supports Virtual machines of up to 16 vCPUs and 256GB RAM although this size VM would be discouraged in favour of a scale out approach (where possible)

10. The cluster aligns with a virtualization friendly “Scale out” methodology

11. Using smaller hosts (either single socket, or less cores per socket) would not meet the requirement to support supports Virtual machines of up to 16 vCPUs and 256GB RAM , would likely require multiple clusters and require additional 10GB and 1GB cabling as compared to the Two Socket configuration

12. The two socket configuration allows the cluster to be scaled (expanded) at a very granular level (if required) to reduce CapEx expenditure and minimize waste/unused cluster capacity by adding larger hosts

13. Enabling features such as Distributed Power Management (DPM) are more attractive and lower risk for larger clusters and may result in lower environmental costs (ie: Power / Cooling)

Alternatives

1.  Use Four Socket Servers w/ >= 8 cores per socket , 512GB Ram , 4 x 10GB NICs
2.  Use Single Socket Servers w/ >= 8 cores , 128GB Ram , 2 x 10GB NICs
3. Use Two Socket Servers w/ >= 8 cores , 512GB Ram , 2 x 10GB NICs
4. Use Two Socket Servers w/ >= 8 cores , 384GB Ram , 2 x 10GB NICs
5. Have two clusters of 9 hosts with the recommended hardware specifications

Implications

1. Additional IP addresses for ESXi Management, vMotion, FT & Out of band management will be required as compared to a solution using larger hosts

2. Additional out of band management cabling will be required as compared to a solution using larger hosts

Related Articles

1. Example Architectural Decision – Network I/O Control for ESXi Host using IP Storage (4 x 10 GB NICs)

2. Example VMware vNetworking Design w/ 2 x 10GB NICs

3. Network I/O Control Shares/Limits for ESXi Host using IP Storage

4. VMware Clusters – Scale up for Scale out?

5. Jumbo Frames for IP Storage (Do not use Jumbo Frames)

6. Jumbo Frames for IP Storage (Use Jumbo Frames)