Problem Statement

What is the most suitable deployment mode for vCenter Single-Sign On (SSO) in an environment where there is a single physical datacenter with multiple vCenter servers?

Requirements

1. The solution must be a fully supported configuration
2. Meet/Exceed RTO of 4 hours
3. Support Single Pane of glass management
4. Ability to scale for future vCenters and/or datacenters

Assumptions

1. All vCenter instances can access the same Authentication source (Active Directory or OpenLDAP)

2. The average number of authentications per second for each SSO instance is <30 (Configuration Maximum)

Constraints

1. vCenter servers reside in different network security zones within the datacenter

Motivation

1. Future proof the environment

Architectural Decision

1. Use “Multi-site” SSO deployment mode

2. Use one SSO instance per vCenter

3. Each SSO instance will reside with the vCenter on a Windows 2008 x64 R2 virtual machine in a vSphere cluster with HA enabled

4. Each SSO instance will use the bundled SQL database

5. (Optional) For greater availability, vCenter Heartbeat can be used to protect each SSO instance along with vCenter and the bundled SSO database

6. The Virtual Machine hosting vCenter/SSO will be 2vCPU and 10GB RAM to support vCenter/SSO/Inventory Service and an additional 2GB RAM to support the bundled SSO Database

7. Using the bundled SSO database ensures only a single vCenter Heartbeat deployment is required to protect each vCenter/SSO instance and reduce Windows licensing

Justification

1. To simplify the maintenance/upgrade process for vCenter/SSO as different versions of vCenter cannot co-exist with the same SSO instance

2. If “High Availability” mode is used it would prevent single pane of glass management

3. “High Availability” mode currently requires an SSL load balancer to be configured as well as manual intervention which can be complicated and problematic to implement and support

4. “Basic” mode prevents the use of Linked Mode which will prevent the management of the environment being single pane of glass

5. Where vCenter servers reside in different network security zones, Using Multi-site mode allows each SSO instance to use authentication sources that are as logically close as possible while supporting single pane of glass management. This should provide faster access to authentication services as each SSO instance is configured with Active Directory servers located in the same or logically closest network security zone/s.

6. If one instance SSO goes offline for any reason, it will only impact a single vCenter server. It will not prevent authentication to the other vCenter servers.

7. Reduce the licensing costs for Microsoft Windows 2008 by combining SSO and vCenter roles onto a single OS

Alternatives

1. Use “Basic” Mode, resulting in a standalone version of SSO for each vCenter server with no single pane of glass management

2. Use “High Availability” mode per vCenter

3. Use a shared “High Availability” mode for all vCenters in the datacenter

4. In any SSO configuration, Host the SSO database (per vCenter) on a Oracle OR SQL Server

5. Run SSO on a dedicated Windows 2008 instance with or without the SSO database locally

6. Run a single SSO instance in “Multi-Site” mode , use vCenter Heartbeat to protect SSO (including the database) and share the SSO instance with all vCenters

Implications

1. Where SSO is not protected by vCenter Heartbeat (optional), SSO for each vCenter is a Single point of failure where authentication to the affected vCenter will fail

2. “Multi-Site” mode requires the install-able version of SSO, which is Windows Only which prevents the use of the vCenter Server Appliance (VCSA) as it only supports basic mode.

Related Articles

1. vSphere 5.1 Single Sign On (SSO) deployment mode across Active/Active Datacenters

2. vSphere 5.1 Single Sign On (SSO) Architectural Decision Flowchart

3. Disabling Single Sign On – Dont Do It! – Michael Webster (VCDX#66) @vcdxnz001

CloudXClogo

 

 

VMware Clusters – Scale up or out?

I get asked this question all the time, is it better to Scale up or out?

The answer is of course, it depends. 🙂

First lets define the two terms. Put simply,

Scale Up is having larger hosts, and less of them.

Scale Out is having more smaller hosts.

What are the Pro’s and Con’s of each?

Scale Up 

* PRO – More RAM per host will likely achieve higher transparent memory sharing (higher consolidation ratio!)

* PRO – Greater CPU scheduling flexibility as more physical cores are available (less chance for CPU contention!)

* PRO – Ability to support larger VMs (ie: The 32vCPU monster VM w/ 1TB RAM)

* PRO – Larger NUMA node sizes for better memory performance. Note: For those of you not familiar with NUMA, i recommend you check out Sizing VMs and NUMA nodes | frankdenneman.nl

* PRO – Use less ports in the Data and Storage networks

* PRO – Less complex DRS simulations to take place (every 5 mins)

* CON – Potential for Network or I/O bottlenecks due to larger number of VMs per host

* CON – When a host fails, a larger number of VMs are impacted and have to be restarted on the surviving hosts

* CON – Less hosts per cluster leads to a higher HA overhead or “waste”

* CON – Less hosts for DRS to effectively load balance VMs across

Scale Out

* CON – Less RAM per host will likely achieve lower transparent memory sharing (thus reducing overcommitment)

* CON – Less physical cores may impact CPU scheduling (which may lead to contention – CPU ready)

* CON – Unable to support larger VMs (ie: 8vCPU VMs or the 32vCPU monster VM w/ 1TB RAM)

* CON – Use more ports in the Data and Storage networks – ie: Cost!

* PRO – Less likely for Data or I/O bottlenecks due to smaller number of VMs per host

* PRO – When a host fails, a smaller number of VMs are impacted and have to be restarted on the surviving hosts

* PRO – More hosts per cluster may lead to a lower HA overhead or “waste”

* PRO – Greater flexibility for DRS to load balance VMs

Overall, both Scale out and up have their advantages so how do you choose?

When doing your initial capacity planning exercise, determine how many VMs you will have day 1 (and their vCPU/RAM/Disk/Network/IOPS) and try and start with a cluster size which gives you the minimum HA overhead.

Example: If you have 2 large hosts with heaps of CPU / RAM your HA overhead is 50%, if you have 8 smaller hosts your overhead is 12.5% (both with N+1).

As a general rule, I believe the ideal cluster would be large 4 way hosts with a bucket load of ram and around 16-24 hosts. This would be in my opinion the best of both worlds. Sadly, few environments meet the requirements (or have the budget) for this type of cluster.

I believe a cluster should ideally start with enough hosts to ensure a sufficient number of hosts to minimize the initial HA overhead (say <25%) and ensure DRS can load balance effectively, then scale up (eg: RAM) to cater for additional VMs. If more compute power is required in future, scaling out and then scaling up (add RAM) further. I would generally suggest not to design to the maximum, so up to 24 node clusters.

From a HA perspective, I feel in a 32 node cluster, 4 hosts worth of compute should be reserved for HA, or 1 in 8 (12.5% HA Reservation). Similar to the RAID-DP concept from Netapp, of 14+2 disks in a RAID pack.

Tip: Choose Hardware which can be upgraded (Scaled up) . Avoid designing a cluster with hosts hardware specs maxed out day 1.

There are exceptions to this, such as Management clusters, which may only have (and need) 2 or 3 hosts over their life span, (eg: For environments where vCloud Director is used), or environments with static or predictable workloads.

To achieve the above, the chosen hardware needs to be upgradable, ie: If a Servers maximum RAM is 1TB, you may consider only half populating it (being careful to choose DIMMs that allow you to expand) to enable you to scale up as the environments compute requires grow.

Tip: Know your workloads! So use tools like Capacity Planner so you understand what your designing for.

It is very important to consider the larger VMs, and ensure the hardware you select has suitable number of physical cores.

Example: Don’t expect 2 x 8vCPU VMs (highly utilized) to run well together on a 2 way 4 core host.

When designing a new cluster or scaling an existing one, be sure to consider the CPU to RAM ratio, so that you don’t end up with a cluster with heaps of available CPU and maxed out memory or vice versa. This is a common mistake i see.

Note: Typically in environments I have seen over many years, Memory is almost always the bottleneck.

The Following is an example where a Scale Out and Up approach end up with very similar compute power in their respective clusters, but would likely have very different performance characteristics and consolidation ratios.

Example Scenario: A customer with 200 VMs day one , and lets say the average VM size is 1vCPU / 4GB RAM but they have 4 highly utilized 8vCPU / 64GB Ram VMs running database workloads.

The expected consolidation ratio is 2.5:1 vCPUs to physical cores and 1.5:1 vRAM to physical Ram.

The customer expects to increase the number of VMs by 25% per year, for the next 3 years.

So our total compute required is

Day one : 92.8 CPU cores and 704GB Ram.

End of Year 1 : 116 CPU cores and 880GB Ram.

End of Year 2 : 145 CPU cores and 1100GB Ram.

End of Year 3 : 181 CPU cores and 1375GB Ram.

The day 1 requirements could be achieved in a number of ways, see two examples below.

Option 1 (Scale Out) – Use 9 hosts with 2 Way / 6 core / 96GB Ram w/ HA reservation of 12% (~N+1)

Total Cluster Resources = 108 Cores & 864GB RAM

Usable assuming N+1 HA = 96 cores & 768GB RAM

Option 2 (Scale Up) – Use 4 hosts with 4 Way / 8 core / 256GB Ram w/ HA reservation of 25% (~N+1)

Total Cluster Resources = 128 Cores & 1024GB RAM

Usable assuming N+1 HA = 96 cores & 768GB RAM

Both Option 1 and Option 2 appear to meet the Day 1 compute requirements of the customer, right?

Well, yes, at the high level, both scale out and up appear to provide the required compute resources.

Now lets review how the clusters will scale to meet the End of Year 3 requirements, after all, we don’t design just for day 1 do we. 🙂

End of Year 3 Requirements : 181 CPU cores and 1375GB Ram.

Option 1 (Scale Out) would require ~15 hosts (2RU per host) based on CPU & ~15 hosts based on RAM plus HA capacity of ~12% (N+2 as the cluster is >8 hosts.) taking the total required hosts to 18 hosts.

Total Cluster Resources = 216 Cores & 1728GB RAM

Usable assuming N+2 HA = 190 cores & 1520GB RAM

Note: At between 16 and 24 hosts N+3 should be considered. (Equates to 1 spare host of compute per 8 hosts)

Option 2 (Scale Up) – would require Use 6 hosts (4RU per host) based on CPU &  5 hosts based on RAM plus HA capacity of ~15% (N+1 as the cluster is <8 hosts.) taking the total required hosts to 7 hosts.

Total Cluster Resources = 224 Cores & 1792GB RAM

Usable assuming N+1 HA = 190 cores & 1523GB RAM

So on the raw compute numbers, we have two viable options which scale from Day to end of Year 3 and meet the customers compute requirement.

Which option would I choose I hear you asking, good question.

I think I could easily defend either Option, but I believe Option 2 would be be more economically viable and result in better performance. The below are a few reasons for my conclusion.

* Option 2 Would give significant transparent page sharing, compared to Option 1 therefore getting a higher consolidation ratio.

* Option 2 would likely be much cheaper from a Network / Storage connectivity point of view (less connections)

* Option 2 is more suited to host the 4 x 8vCPU highly utilized VMs (as they fit within a NUMA node and will only use 1/4 of the hosts CPU as opposed to 3/4’s of the 2 Way host)

* The 4 way (32 core) host would provide better CPU scheduling due to the large number of cores

* From a data center perspective, Option 2 would only use 28RU compared to 36RU

Note: A cluster of 7 hosts is not really ideal, but in my opinion is large enough to get both HA and DRS efficiencies. The 18 node cluster (option 1) is really in the sweet spot for cluster sizing, but the CPUs did not suit the 8 vCPU workloads. Had Option 1 used 8 core processors that would have made Option 1 more attractive.

Happy to hear everyone’s thoughts on the topic.